Projects

Riverhead Coatesville Bridge gas pipeline refurbishment , Murray Jones Reserve

Auckland

Project Details
Project Type
Maintenance
Client
Electrix, Vector
Services Utilised
Scaffolding, shrink wrapping, water blasting, sand blast and spray painting, installation of seismic brackets
Timeline
17 days
Project Description

This job consisted of installing scaffolding for access to the pipeline, then shrink wrap and geo cloth was installed. The pipeline was then waterblasted and sand blasting to removing the coating. We applied 3 coats of paint and removed the old brackets and supports. 17 new brackets were installed in total.