This job consisted of installing scaffolding for access to the pipeline, then shrink wrap and geo cloth was installed. The pipeline was then waterblasted and sand blasting to removing the coating. We applied 3 coats of paint and removed the old brackets and supports. 17 new brackets were installed in total.