Projects

Way Out West

Kuemu

Project Details
Project Type
Tower Painting
Client
Transpower
Services Utilised
Timeline
Jan - June 2020
Project Description

Our Transpower Tower team lead by Rizal and his crew had a tough ride into site for a number of weeks in Kumeu. The track into site was 500 meters into the bush and consistently covered in mud. We ensured the safe approach at all times for access, having utilising our extensive 4wd training skills using a mixture of suitable off road vehicles, including our trusty Polaris. To prevent any significant hazard driving, we used a huge tractor to bring our truck in and out of site and selected the appropriate weather to eliminate any risk and avoid having to walk out in the mud leaving the vehicles behind. A happy team doing a great job in very difficult conditions.